Kinedizer LE Burner
KINEDIZER® LE · 10" model · Maxon (Honeywell)
- Serial
- MX-KLE10-2023-04719
- Installed
- Aug 14, 2023
- Site
- Industria Machina Demo Plant · Cell B-3
- On asset
- CleanSwitch RTO · CS-1235
- Component
- Burner Assembly · Main combustion chamber
- Last inspected
- Apr 22, 2026
Manuals
Manufacturer documentation, datasheets, and installation guides for this exact part. Available to anyone with the QR.
Specifications
Operating envelope distilled from the manufacturer datasheet. Useful for sanity-checking field readings against design intent.
- Max capacity (n=1.3 low NOx)
- 24.3 MBtu/h
- Min capacity
- 1.215 MBtu/h
- Turndown
- 20:1
- Air flow at max
- 5,050 scfm
- Flame length @ n=1.3
- 9 ft
- Flame diameter @ n=1.3
- 4 ft
- Natural gas inlet ΔP
- 75 "wc
- Weight
- 662 lbs
- Max chamber temperature
- 2,000 °F
- Combustion air temp
- Ambient to 660 °F
- Fuel
- Natural gas, propane, other gaseous fuels
- Burner tip material
- AISI 310 (1.4541)
- Refractory block
- Castable, 50% SiO₂ / 45% Al₂O₃
Maintenance reports
Field service history for this asset. Each entry links to the full report with photos, observations, and corrective actions.
- WARNINGR-2026-04-22-KLE004 Apr 22, 2026 · M. Reyes
Burner tip showing early-stage spalling on outboard quadrant. Block sleeve seal nominal.
- GOODR-2026-01-15-KLE004 Jan 15, 2026 · A. Whitfield
Quarterly: no abnormalities. Pilot light-off pressure 0.08"wc, within spec. Combustion air ΔP 30"wc.
- CRITICALR-2025-10-08-KLE004 Oct 8, 2025 · M. Reyes
Gas inlet test connection seal leaking 0.4"wc — replaced gasket and re-torqued to 18 ft·lb. Confirmed leak-tight after rebuild.
- GOODR-2025-07-02-KLE004 Jul 2, 2025 · J. Park
Annual: stainless burner parts inspected, no discoloration beyond expected oxide layer. Block intact.
Vision scanning
Walk the part. Photograph each checklist step on your phone. Luthier runs a vision model trained on this fleet's history and produces a structured report with annotated findings — typically in under 90 seconds per checklist item.
Admin
Asset lifecycle controls: re-pair the sticker to a different physical unit, transfer location, schedule preventive maintenance, decommission. Restricted to plant admins.