Industria Machina
Vision-driven equipment inspection
Report
#0005
— Inspection report
Overall · GOOD

CleanSwitch

Demo walkdown
Client
Dürr
Site
Demo walkdown
Equipment
CleanSwitch
Walkdown date
May 13, 2026
Technician
M. Lewis
Findings
5
Action items
4
Generated
May 13, 2026

Executive summary

External walkdown of the CleanSwitch RTO found no abnormalities on the housing, ductwork, gas train, dampers, or access structures. Nameplate data was captured for two units (CS-650 shipped 03/2016 and CS600 shipped 09/2010), and safeties tested OK during the electrical and pneumatic check. Given the 14+ year service age on the older unit, schedule an internal media bed and switching valve inspection at the next planned outage.

Prioritized actions

  1. 1
    Plan internal media bed and switching valve inspection at next scheduled outage on CS1123.
    Target: next planned outage
    INFO
  2. 2
    Archive captured nameplate data (CS1217 and CS1123) in equipment master record for traceability.
    Target: within 30 days
    INFO
  3. 3
    Verify exhaust fan vibration and bearing temperature trends against baseline at next PM.
    Target: next quarterly inspection
    INFO
  4. 4
    Continue routine external walkdowns of ductwork, gas train, and damper actuators.
    Target: next quarterly inspection
    GOOD

Findings

Generated by Industria Machina
May 13, 2026
Report
#0005
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal