← Back to all inspections
— Inspection #52

industrial boiler

May 20, 2026, 1:08:08 PM · 12432ms · 3618 tokens · card #3
Overall severity
MEDIUM
— Summary

Manifold interior shows a uniform layer of process buildup/deposits coating the walls and the switch valve face, consistent with the most common defect in this fleet.

— Recommended action

Schedule manifold cleaning; document buildup extent and re-inspect valve travel.

— Observations (3)
MEDIUM
Granular deposits coating the manifold interior walls.
confidence 88%
MEDIUM
Switch valve face and bolted seal plate covered in process buildup.
confidence 85%
LOW
No evidence that buildup is restricting valve motion or contacting the lift cylinder.
confidence 55%
— Classification
part
access door/manway
type
industrial boiler
view
close-up exterior
family
boiler
reason
A bolted, gasketed access door with lifting handle on a heavy pressure vessel wall, typical of a boiler or furnace manway.
source
context
confidence
0.55
taxonomy_type_id
null
taxonomy_family_id
null
— Retrieved examples
#3388#1593#1464#3072#441

Top-K examples from the knowledge corpus used as visual context for this inspection.

— Metadata
image_uri
s3://luthier-assets/inspections/1/09bcd936-6b5c-4f17-baa3-aaaa7e8f58aa-0002-b16c6e338c9196b5.png
model_version
claude-opus-4-7
prompt_template
inspect-v2
tokens (in/out)
2915 / 703
cache (creation/read)
0 / 0
latency
12432 ms
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal