← Back to all inspections
— Inspection #51

industrial boiler

May 19, 2026, 9:10:45 PM · 13051ms · 3616 tokens · card #3
Overall severity
MEDIUM
— Summary

Manifold interior shows a uniform layer of process buildup coating the walls and the switch valve face/seal plate area.

— Recommended action

Schedule manifold cleaning to remove process buildup before deposits thicken or migrate to valve sealing surfaces.

— Observations (3)
MEDIUM
Granular deposits visible on manifold interior walls.
confidence 90%
MEDIUM
Buildup also coats the switch valve face and surrounding seal plate bolted flange.
confidence 88%
LOW
No evidence that deposits are restricting valve motion or contacting moving cylinder/spindle hardware.
confidence 50%
— Classification
part
access door/manway
type
industrial boiler
view
close-up
family
boiler
reason
Riveted/bolted hinged door with handle on a refractory-lined chamber, typical of a boiler or furnace access manway.
source
context
confidence
0.5
taxonomy_type_id
null
taxonomy_family_id
null
— Retrieved examples
#3388#1593#1464#3072#441

Top-K examples from the knowledge corpus used as visual context for this inspection.

— Metadata
image_uri
s3://luthier-assets/inspections/1/db823983-45b1-4d76-b835-f87a68be04e7-0002-b16c6e338c9196b5.png
model_version
claude-opus-4-7
prompt_template
inspect-v2
tokens (in/out)
2915 / 701
cache (creation/read)
0 / 0
latency
13051 ms
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal