← Back to all inspections
— Inspection #46

regenerative thermal oxidizer

May 18, 2026, 4:09:16 PM · 15161ms · 6558 tokens · card #2
Overall severity
NONE
— Summary

Overall exterior view of CleanSwitch RTO unit documented during routine PM inspection; unit appears intact with ductwork, access platform, ladder, and control enclosure all in place and no visible abnormalities.

— Recommended action

No action required; routine documentation complete.

— Observations (4)
NONE
Main unit housing and CleanSwitch branding panel intact with no visible corrosion or panel damage.
confidence 92%
NONE
Access platform and yellow ladder are in place and structurally sound.
confidence 95%
NONE
Overhead ductwork is supported and shows no visible leaks or insulation loss.
confidence 88%
NONE
Control enclosure on the right side is closed and undamaged.
confidence 90%
— Classification
part
main unit with ductwork and access platform
type
regenerative thermal oxidizer
view
exterior side view
family
air pollution control
reason
Large skid-mounted gray vessel with overhead exhaust ductwork, gas piping, access ladder/platform and 'CleanSwitch' label characteristic of an RTO installation.
source
context
confidence
0.78
taxonomy_type_id
null
taxonomy_family_id
null
— Retrieved examples
#1972#1797#1985#1732#1987

Top-K examples from the knowledge corpus used as visual context for this inspection.

— Metadata
image_uri
s3://luthier-assets/inspections/1/8d45be05-06e6-4f86-8930-fde8883c9879-0004-eb9404a9f972743c.png
model_version
claude-opus-4-7
prompt_template
inspect-v2
tokens (in/out)
5679 / 879
cache (creation/read)
0 / 0
latency
15161 ms
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal