← Back to all inspections
— Inspection #27

regenerative thermal oxidizer

May 13, 2026, 8:56:15 PM · 15065ms · 2625 tokens · card #2
Overall severity
NONE
— Summary

Overall exterior view of CleanSwitch RTO unit with ductwork, access platform, ladder, and control enclosure visible; no abnormalities described.

— Recommended action

No action required; routine PM documentation complete.

— Observations (4)
NONE
Main RTO housing and CleanSwitch branding panel intact with no visible corrosion or panel damage.
confidence 92%
NONE
Access ladder and elevated platform appear secure and in place.
confidence 90%
NONE
Overhead ductwork and gas piping routing appear intact with no visible leaks or insulation damage.
confidence 85%
NONE
Control/electrical enclosure on right side closed and undamaged.
confidence 88%
— Classification
part
main unit with ductwork and access platform
type
regenerative thermal oxidizer
view
exterior side view
family
air pollution control
reason
Large outdoor industrial enclosure with insulated exhaust ducting, gas piping manifold, access platform/ladder, and 'CleanSwitch' nameplate typical of an RTO emissions control system.
source
context
confidence
0.7
taxonomy_type_id
null
taxonomy_family_id
null
— Retrieved examples
#1972#1797#1985#1732#1987

Top-K examples from the knowledge corpus used as visual context for this inspection.

— Metadata
image_uri
s3://luthier-assets/inspections/1/99aa7e66-9f5b-4a3e-a041-ee233aecad1b-0004-eb9404a9f972743c.png
model_version
claude-opus-4-7
prompt_template
inspect-v2
tokens (in/out)
1743 / 882
cache (creation/read)
3936 / 0
latency
15065 ms
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal