← Back to all inspections
— Inspection #26

regenerative thermal oxidizer

May 13, 2026, 8:55:12 PM · 17533ms · 6721 tokens · card #2
Overall severity
LOW
— Summary

Overall exterior view of CleanSwitch RTO unit appears structurally intact with ductwork, platform, ladder, and control enclosure in place; however, technician reports new fine light-tan dust accumulation around the lower duct flange that was not present six months ago, suggesting possible incipient flange leakage or seal degradation.

— Recommended action

Inspect and re-torque the lower duct flange bolts, check gasket condition, and sample/identify the tan dust; monitor for progression at next PM.

— Observations (3)
NONE
Unit exterior, ductwork, access platform, ladder, and control enclosure are intact with no visible structural damage or corrosion.
confidence 90%
LOW
Technician-reported fine light-tan dust deposit around lower duct flange indicates a new, slow particulate escape consistent with a developing gasket or flange-seal leak.
confidence 70%
NONE
No visible flames, smoke, panel deformation, or insulation damage observed in the photo.
confidence 90%
— Classification
part
complete unit with ductwork and access platform
type
regenerative thermal oxidizer
view
exterior side view
family
air pollution control
reason
Large insulated ducting feeds a boxy multi-chamber vessel with gas piping, burner access and a CleanSwitch control panel, typical of a regenerative thermal oxidizer (RTO) installed outside a facility.
source
context
confidence
0.78
taxonomy_type_id
null
taxonomy_family_id
null
— Retrieved examples
#1972#1797#1985#1732#1987

Top-K examples from the knowledge corpus used as visual context for this inspection.

— Metadata
image_uri
s3://luthier-assets/inspections/1/d5a47a7e-5d58-456d-9471-2c22828a9e37-0004-eb9404a9f972743c.png
model_version
claude-opus-4-7
prompt_template
inspect-v2
tokens (in/out)
5762 / 959
cache (creation/read)
0 / 0
latency
17533 ms
© Industria Machina · Demonstration prepared for Dürr
System health: 99.8% Nominal