VOC1015

10 checklist steps · 266 examples · card v2 distilled from 246 · 20 added since
20 new examples since this card was distilled

They're highlighted below with the New tag. Regenerate the card to fold them in.

The 10 steps Luthier walks every technician through for this equipment type. Severity signals show what to flag.

baseline v2
  1. Step 01 · Overall Unit

    Document overall view of the Vocsidizer unit

    Establishes baseline condition of the unit exterior and orients all subsequent inspection imagery.

    Focus: Capture a full exterior view showing the chamber, stack, cabinets, and gas train; note any visible corrosion, damage, or leaks.
    Severity signals (2)
    • no visible abnormality → NONE
    • obvious external damage or leakage → MEDIUM
  2. Step 02 · Media Bed / Cold Face

    Inspect media bed, cold face, and cold face support (A and B sides)

    Media beds and cold faces are the core heat-recovery element; fouling, slumping, or damage degrades destruction efficiency.

    Focus: On both A and B sides, look for media slumping, fouling, cracked or missing cold face blocks, and intact cold face supports; also check chamber insulation.
    Severity signals (3)
    • clean, uniform media with no abnormality → NONE
    • not inspected per caption → LOW
    • visible slumping, cracking, or fouling → MEDIUM/HIGH
  3. Step 03 · Media Support Screens

    Inspect and document media support screens after cleaning

    Screens retain the media bed and must be clean and intact for proper flow distribution.

    Focus: Confirm screens are cleaned, free of debris, and show no tears, deformation, or corrosion on A and B sides.
    Severity signals (2)
    • screen clean and intact → NONE
    • torn or deformed screen → MEDIUM
  4. Step 04 · Burner Stone / Nozzle

    Inspect burner stone, burner nozzle, and flame during heat-up

    Burner condition affects ignition reliability, flame quality, and chamber temperature control.

    Focus: Look at burner stone for cracking or spalling, nozzle for fouling or damage, and flame for stable shape and color during heat-up.
    Severity signals (2)
    • nozzle/stone intact, no fouling → NONE
    • cracked stone or fouled nozzle → MEDIUM
  5. Step 05 · Poppet / Switch Valves 1071 / 1072

    Inspect inlet and outlet poppet/switch valves (A/B, 1071/1072)

    Poppet and switch valves direct process flow between chambers; seat and seal integrity are critical for destruction efficiency.

    Focus: Inspect inlet A/B and outlet A/B seats, seal plate bowtie, valve spindle, drive plate/cylinder, and drive gear; note inlet baffle, valve face, and main valve seal ring condition.
    Severity signals (2)
    • no abnormality described → NONE
    • worn or damaged seal ring/baffle → MEDIUM
  6. Step 06 · Valve Gaps (A1–A23 / B1–B23)

    Measure and record valve gaps across all A and B positions

    Valve gap measurements verify that switch/poppet valves seal properly; out-of-tolerance gaps cause bypass leakage and reduced DRE.

    Focus: Record gap at each position A1–A23 and B1–B23; flag any readings at or near zero clearance or significantly uneven across positions.
    Severity signals (3)
    • all gaps within tolerance → NONE
    • several values at or near zero clearance → MEDIUM
    • widespread out-of-tolerance gaps → HIGH
  7. Step 07 · Poppet Shafts and Bearings

    Inspect poppet shafts and bearings on A and B sides (1071/1072)

    Shaft straightness and bearing wear drive valve sealing performance and mechanical reliability.

    Focus: Check shafts for bending, scoring, or corrosion; inspect bearings for wear, play, or contamination.
    Severity signals (2)
    • no abnormality → NONE
    • visible wear or shaft deflection → MEDIUM
  8. Step 08 · Exhaust Fan / Bearings / Manifold

    Inspect exhaust fan wheel, bearings, coupling, and exhaust end of manifold

    The exhaust fan drives process flow; bearing, coupling, or wheel issues cause vibration, noise, and flow loss.

    Focus: Look at fan wheel for buildup or damage, bearings for grease condition and wear, coupling alignment, and manifold for corrosion or leaks.
    Severity signals (2)
    • components in good condition → NONE
    • bearing noise or fan damage → MEDIUM
  9. Step 09 · External Process & Recirculation Valves / Dampers

    Externally inspect process, recirculation, stack valves, and fresh air/purge damper

    External valves and dampers control process routing; leaks or actuator faults disrupt operation.

    Focus: Check FV-RST01060/61/67/73/74/160/161, PCV-RST01076, and fresh air/purge damper for leaks, corrosion, missing fasteners, and actuator condition.
    Severity signals (2)
    • no leaks or damage → NONE
    • leak, corrosion, or actuator fault → MEDIUM
  10. Step 10 · Poppet Cabinet / Gas Train / Control Cabinet

    Inspect poppet cabinet, pressure devices, gas train, and control cabinet

    Cabinets and gas train house safety and control devices; pneumatic, electrical, or gas leaks compromise safe operation.

    Focus: Check gas train for leaks/corrosion, pneumatic lines for damage, pressure switches and gauges for proper readings, and cabinets for damaged components or loose connections.
    Severity signals (2)
    • routine documentation, no findings → NONE
    • leak or electrical fault → MEDIUM/HIGH